<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
Volume 38 Issue 10
Jul.  2021
Turn off MathJax
Article Contents
YE Long-gang, LIN Wen-rong, CHEN Yong-ming, LI Yun, TANG Chao-bo. Recovery of lead and silver from lead-bearing wastes using reducing-matting smelting process[J]. Chinese Journal of Engineering, 2016, 38(10): 1404-1409. doi: 10.13374/j.issn2095-9389.2016.10.008
Citation: YE Long-gang, LIN Wen-rong, CHEN Yong-ming, LI Yun, TANG Chao-bo. Recovery of lead and silver from lead-bearing wastes using reducing-matting smelting process[J]. Chinese Journal of Engineering, 2016, 38(10): 1404-1409. doi: 10.13374/j.issn2095-9389.2016.10.008

Recovery of lead and silver from lead-bearing wastes using reducing-matting smelting process

doi: 10.13374/j.issn2095-9389.2016.10.008
  • Received Date: 2015-12-10
    Available Online: 2021-07-22
  • In view of the difficulty in environmental and economic treatments of lead-bearing wastes generated in lead and zinc smelter,a new reducing-matting smelting process was proposed to recycle secondary lead from multiple lead-bearing wastes in this paper. In the process,the designed mixture of lead sludge,lead slag,lead ashes and pyrite cinder was used as a smelting object,and ferric oxide,soda and mirabilite and coal powders were a sulfur-fixing agent,additive and reductant,respectively. The effects of factors on the direct recovery rates of lead and silver during the smelting process were studied in detail based on thermodynamic calculations. The optimum conditions are obtained as the following:the mass ratio of FeO to SiO2 is 1.10,the mass ratio of CaO to SiO2 is 0.30,the mass ratio of Na2CO3 to Na2SO4 is 0.7:0.3,the dosage of coal powders is 15% of lead-bearing wastes,the smelting temperature is 1200℃,and the smelting time is 2 h. Comprehensive experiments show that under the optimum conditions,the direct recovery rates of lead and silver are 85.95% and 83.15%,respectively. The process has significant advantages of sulfur fixation,comprehensive utilization and one-step lead smelting.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (268) PDF downloads(16) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    <th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
    <progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
    <th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
    <progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
    <span id="5nh9l"><noframes id="5nh9l">
    <span id="5nh9l"><noframes id="5nh9l">
    <span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
    <th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
    <progress id="5nh9l"><noframes id="5nh9l">
    259luxu-164