<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
Volume 31 Issue 9
Aug.  2021
Turn off MathJax
Article Contents
LU Yong-ming, WANG Feng, HE Dong-feng, XU An-jun, WANG Hong-bing, TIAN Nai-yuan. Establishment of the BOF-caster matching model for the steelmaking plant producing plates and strips[J]. Chinese Journal of Engineering, 2009, 31(9): 1189-1194. doi: 10.13374/j.issn1001-053x.2009.09.015
Citation: LU Yong-ming, WANG Feng, HE Dong-feng, XU An-jun, WANG Hong-bing, TIAN Nai-yuan. Establishment of the BOF-caster matching model for the steelmaking plant producing plates and strips[J]. Chinese Journal of Engineering, 2009, 31(9): 1189-1194. doi: 10.13374/j.issn1001-053x.2009.09.015

Establishment of the BOF-caster matching model for the steelmaking plant producing plates and strips

doi: 10.13374/j.issn1001-053x.2009.09.015
  • Received Date: 2008-10-22
    Available Online: 2021-08-09
  • From the perspective of precision design,a multi-objective programming mathematical model of BOF-caster matching for one production line in the steelmaking plant which produces plates and strips was proposed with production capacity,matching of rhythm time,and investment as the objective functions.Then,by using the same method and based on the mathematical model for one production line,a multi-objective programming mathematical model of BOF-caster matching for the multi production lines was established.The solving method of the model was given by an improved delaminating sequence method. Using JAVA language and through Eclipse software, the model was solved by the method of object-oriented programming. Finally, the model verified that the design scheme of Shougang Jingtang Iron and Steel Co. Ltd. was the better project.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (134) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    <th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
    <progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
    <th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
    <progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
    <span id="5nh9l"><noframes id="5nh9l">
    <span id="5nh9l"><noframes id="5nh9l">
    <span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
    <th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
    <progress id="5nh9l"><noframes id="5nh9l">
    259luxu-164