Thermoeconomic analysis on the converter-refining procedure based on the symbol exergy-economic model
-
摘要: 以S鋼廠生產SPHC鋼種的轉爐-精煉工序為實例,采用熱經濟學分析方法中的經濟分析法對其建立符號經濟模型,構造成本平衡方程,并建立補充方程,進而對轉爐-精煉工序進行熱經濟成本分析,得到了工序各股流的單價以及熱經濟學成本.模型計算結果表明:轉爐-LF流程的精煉鋼水熱經濟成本最低,為2243.12元·t-1,其次是轉爐-CAS流程,為2259.92元·t-1,而轉爐-RH流程的噸鋼精煉鋼水熱經濟學成本最高,為2270.16元·t-1.從節約能源和成本的角度,轉爐-LF流程是SPHC鋼種的合理生產流程.Abstract: Taking the converter-refining procedure of a steel plant as an example,symbol exergy-economic model was established by the exergy-economic analysis method. Then the cost balance equation was constructed,and supplementary equations were established. The unit exergy price and thermal-economic cost of each exergy flow in the procedure were obtained on the converter-refining procedure through thermal-economic analysis. The results show that the thermoeconomic cost of per ton molten steel in the converterladle refine process is the lowest,which is 2243.12 RMB. The thermoeconomic cost of per ton molten steel in the converter-CAS refining process comes second,which is 2259.92 RMB. And the converter-RH refining process has the highest thermal-economic cost of per ton molten steel,which is 2270.16 RMB. From the standpoint of energy conservation and cost reduction,the converter-refining process is the reasonable process for SPHC steel production.
-
Key words:
- converter-refining process /
- thermoeconomic /
- symbol exergy-ecnomic model /
- cost
-

計量
- 文章訪問數: 313
- HTML全文瀏覽量: 86
- PDF下載量: 15
- 被引次數: 0