Effect of a filling method for mining the hanging wall ore on high-steep slope and surrounding rock stability
-
摘要: 以大冶鐵礦高陡邊坡下2#掛幫礦回采為工程背景,首先采用GEO-SLOPE軟件對掛幫礦開采中邊坡穩定性進行了分析;然后通過現場監測及模型相似實驗相結合的手段,研究礦柱及圍巖的應力及位移變化規律,探討了掛幫礦充填法開采對采場圍巖穩定性的影響.研究表明掛幫礦所在露天初始邊坡經過擴幫及內部開采后,安全系數平均值由1.274下降至1.005,邊坡穩定性較差;目前空區采場礦柱及圍巖穩定性較好,但必須對現有采空區進行充填,改變空區及礦柱應力集中狀態,才能進行礦柱及頂底板礦石回采.Abstract: Taking the mining of the 2# hanging wall ore in Daye Iron Mine by a filling method as an engineering background, the change of high-steep slope stability in the mining process was analyzed first in this paper. Then through using on-site monitoring together with similar material simulate experiments, the stress and displacement changing rules of rock pillars and surrounding rock were studied to discuss the effect of mining the hanging wall ore using the filling method on the surrounding rock stability. The results show that the average value of slope safety coefficient decreases from 1.274 to 1.005 after slope expansion and mining. This indicates that the slope stability is poor. Although the rock pillars and surrounding rock are stable currently, the existing mined-out areas must be filled to change the stress concentration state before the mining of pillar ore and the roof & floor ore.
-
Key words:
- open pit mining /
- hanging wall ore /
- filling /
- slope stability /
- monitoring
-

計量
- 文章訪問數: 248
- HTML全文瀏覽量: 81
- PDF下載量: 8
- 被引次數: 0