Establishment of the BOF-caster matching model for the steelmaking plant producing plates and strips
-
摘要: 從精準設計的角度出發,將產能和時間節奏的匹配以及投資效益等指標作為目標函數,提出了全板帶型鋼廠轉爐-連鑄區段單條生產線爐機匹配的多目標規劃數學模型,并采用同樣的方法,在單條生產線模型的基礎上,建立了全板帶型鋼廠多條生產線轉爐-連鑄區段爐機匹配的多目標數學規劃模型.通過改進后的分層序列法給出了所建模型的求解方法,并采用JAVA語言,借助Eclipse軟件,運用面向對象的編程方法對模型進行了求解.最后利用此模型驗證了首鋼京唐鋼鐵聯合有限責任公司煉鋼車間的設計是較優的設計方案.Abstract: From the perspective of precision design,a multi-objective programming mathematical model of BOF-caster matching for one production line in the steelmaking plant which produces plates and strips was proposed with production capacity,matching of rhythm time,and investment as the objective functions.Then,by using the same method and based on the mathematical model for one production line,a multi-objective programming mathematical model of BOF-caster matching for the multi production lines was established.The solving method of the model was given by an improved delaminating sequence method. Using JAVA language and through Eclipse software, the model was solved by the method of object-oriented programming. Finally, the model verified that the design scheme of Shougang Jingtang Iron and Steel Co. Ltd. was the better project.
-
Key words:
- BOF /
- caster /
- matching /
- multi-objective programming /
- mathematical model
-

計量
- 文章訪問數: 134
- HTML全文瀏覽量: 30
- PDF下載量: 5
- 被引次數: 0