Measurement of in-situ stress and relationship between the stress and geologic structure in Datong mining area,China
-
摘要: 為了研究大同礦區在煤炭開采過程中煤和瓦斯突出形成的沖擊地壓、采礦工程圍巖破壞等動力災害的形成原因及其防治對策,采用改進型CSIRO空心包體應變計,對大同礦區進行了四個測點的應力解除測量實驗以及室內溫度標定和圍壓率定實驗.根據實驗結果,利用地應力計算機程序優化求解出每個測點地應力張量,再結合礦區地質構造分析地應力與礦區地質構造的關系.通過研究,獲得了大同礦區的地應力分布規律及其與地質構造的關系.Abstract: In order to study the reasons and preventive measures of dynamic disasters such as shock bump and the destroy of rock mass in mining engineering resulted from the outburst of mash gas and coal during mining, stress-relieving measurement and temperature and confining pressure calibration were made with improved CSIRO cells at 4 measurement points in Datong mining area. Based on the measured results the in-situ stress tensor of each point was computed by a special computer optimization program, and the relationship between in-situ stress and geological structure was analyzed with the geological structure factors of the mining area. The rules of in-situ stress distribution and the relationships between in-situ stress and geologic structure in Datong mining area were obtained.
-
Key words:
- Datong mining area /
- in-situ stress /
- geologic structure /
- tectonic stress /
- in-situ stress measurement
-

計量
- 文章訪問數: 232
- HTML全文瀏覽量: 64
- PDF下載量: 4
- 被引次數: 0