Mechanical behavior investigation of the tunnel construction in metro line No.5 adjacent to Yuting Bridge in Beijing
-
摘要: 以北京地鐵五號線近接玉蜓橋施工為工程背景,運用三維有限元程序ANSYS對地鐵區間隧道的開挖過程進行模擬,分析隧道開挖對玉蜓橋橋臺及地面環境的影響,并將計算結果與實測結果進行對比分析.結果表明,按照設計要求施工,地鐵五號線近接玉蜓橋施工時,對地面環境和橋臺的影響均可控制在設計允許的范圍之內,無需采取額外的預加固措施.Abstract: The excavation process of the tunnel construction in metro line No. 5 adjacent to Yuting Bridge in Beijing was modeled by 3D-ANSYS numerical code. The influence of the excavation on the bridge's platform and ground environment was analyzed. The computed results were compared with measured data. It is shown that the influence of the excavation on the bridge's platform andground environment is in the range of the allowable value following the design. Any additional prior consolidating measure is not needed.
-
Key words:
- metro line No.5 /
- regional tunnel /
- adjacent construction /
- mechanical behavior
-