Controlling of rock burst in chain pillars between hydraulic mining face and drying mining face
-
摘要: 在水采工作面和旱采工作面交接的護巷煤柱處,極易發生沖擊礦壓事故.通過對沖擊礦壓機理的分析,認為沖擊礦壓的發生是由于積聚較高能量的受載煤體裂紋不穩定擴展所致.提出了增加卸載區的范圍,促使煤體裂紋穩定擴展,降低單位煤體儲能,從而控制沖擊礦壓發生的原理.給出了該條件下增加煤體孔隙率,減少瓦斯、空氣流通通道的防治原則.在此基礎上,給出了分段治理,注水和注漿相結合的防治方案.工程實踐證明該方案是切實有效的.Abstract: Rock burst was easily happened at chain pillars face. According to the mechanism analysis of rock burst, the between hydraulic mining face and drying mining cracks in the loaded coal mass under the condition of high-energy unstable development would lead to rock burst happening, and would bring forward controlling principle of rock burst that impel crack in coal mass to develop stably and decease energy storied in unit coal mass by lengthening the unloaded area, for controlling of the rock burst at chain pillar between hydraulic mining face and drying mining face. Under this condition, the preventive measure was increasing the porosity of coal mass and deceasing the circulating channels of gas and air. Based on the principle, the preventive scheme was put forward by stage and combining water infusion with grouting. Project practice proved that the scheme was effective.
-
Key words:
- rock burst /
- instability /
- chain pillar /
- water infusion in coal seams
-

計量
- 文章訪問數: 191
- HTML全文瀏覽量: 94
- PDF下載量: 5
- 被引次數: 0