Application of Multiply Anchor-piles to Foundation Reinforcement
-
摘要: 根據某橋墩基礎承載力下降的具體情況,采用單孔復合錨桿樁技術,對橋墩基礎進行了加固,并對單孔復合錨桿樁的加固機理進行了初步研究.利用數值模擬方法,對加固后橋墩基礎的承載能力以及加固結構的承載性能進行了比較系統地分析.結果表明:利用單孔復合錨桿樁技術加固后的橋墩基礎,其承載力有較大幅度地提高,在600kN/m的橋墩載荷作用下,加固結構和周圍的巖體在垂直方向上的位移變形值不足2mm,而且基本上保持著同步變形同步穩定的理想狀態,達到了設計目的.Abstract: According to the in-situ information about the load-carrying capacity descent of pier rock mass foundation, the multiply anchor-pile technique in a single bore was adopted in the reinforcement. The mechanism of the technique was analyzed in the rudimental stage. By using of numerical simulation, the load-carrying capacity of pier foundation and anchor-piles were also calculated after reinforcement. The result shows that, after reinforcement the load-carrying capacity of pier rock mass foundation was increased largely. Under the loading of 600 kN/m from the pier, the maximum value of vertical displacement of anchor-piles and rock mass was less than 2 mm, and that it is keeping synchronous in the displacing process.
-
Key words:
- multiply anchor-pile /
- foundation reinforcement /
- pier foundation /
- numerical simulation
-

計量
- 文章訪問數: 156
- HTML全文瀏覽量: 18
- PDF下載量: 8
- 被引次數: 0