Development of a Geological Database for the Volume Visualization System of Chengchao Iron Mine
-
摘要: 通過分析程潮鐵礦地質采樣數據的特點,結合礦床及其開采設計體視化仿真系統的性能需求,從數據庫表結構、表間關系及數據的錄入處理等三個方面,描述了礦床地質數據庫建立過程,采用ADO相關技術實現了地質數據庫管理子系統.實踐表明,本系統是合理的、有效的.Abstract: An approach to the development of a geological database and its mangement system was presented, including the methology for design, implementation, and input data manipulation of the geological system. Besed on ADO (Active Data Object) and its relative technologies, the geological database and its management system were developed, and a case study with data from Chengchao Iron Mine was conducted. The results have demonstrated the validity of the system.
-
Key words:
- volume visualization /
- simulation /
- geological database
-

計量
- 文章訪問數: 185
- HTML全文瀏覽量: 58
- PDF下載量: 7
- 被引次數: 0