Computer Aided Production Scheduling System for Underground Coal Mines
-
摘要: 分析了地下礦采掘計劃的技術特點和礦山生產計劃數學模型與計算機方法的研究現狀,給出了一種地下煤礦采掘銜接計劃計算機輔助管理系統的設計方法及其實現技術,指出了提高地下礦生產計劃計算機管理系統的適用性與實用性的途徑。Abstract: The development and achievements are reviewed in the use of mathematical models and computer techniques in mine planning and production scheduling.An integrated and interactive approach to computer aided production scheduling systems is presented.As an application of the approach,the implementing features of a computer aided production scheduling system for underground coal mines are discussed.
-
Key words:
- mine /
- mining /
- simulation /
- MIS
-

計量
- 文章訪問數: 287
- HTML全文瀏覽量: 86
- PDF下載量: 7
- 被引次數: 0