<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">

基于上覆巷道保護的下伏煤層安全回采

Mining safely under a coal seam while protecting an overlying roadway

  • 摘要: 針對千米深井下伏煤層回采需保證上覆巷道穩定性的問題,通過理論分析、數值模擬和現場實測的方法,研究了下伏煤層開采過程中上覆巖層巷道變形破壞類型、破壞機理和防治辦法。通過對開采條件和開采形成的覆巖空間結構的研究,得到了走向和傾向方向上的巷道變形破壞規律;通過研究下伏工作面不同開采階段、不同充填率條件對上覆巷道的采動影響,得到了巷道變形破壞的應力演化規律。結果表明:千米深井下伏煤層開采,上覆巷道潛在的變形破壞類型主要有兩種,一是巷道斷面縮減型破壞,二是巷道走向階梯下沉型破壞。上覆巷道變形破壞的根本原因是大埋深、強采動應力,特別是下伏煤層距上覆巷道較近且距離不均等的影響,直接原因是采動造成的巷道圍巖應力突增及關鍵巖層的破斷下沉。開采過程中,工作面走向開采范圍超過400 m時,巷道斷面縮減型破壞和走向階梯下沉型破壞會相互疊加,誘發更大的巷道破壞。為控制這兩種巷道的潛在破壞類型,設計了沿工作面下部巷道動態部分充填和巷道補強支護方案,通過現場實測發現上述方案能夠滿足上覆巷道穩定性和下伏工作面高效高產的要求,研究結果和控制方案可為千米深井巷道下壓煤的安全回采提供一定的借鑒。

     

    Abstract: To ensure the stability of an overlying roadway in close proximity to a 1000-m deep coal seam, this work, through theoretical analysis and numerical simulation, studies the deformation and failure mechanism, failure types, and prevention methods of the overlying roadway while mining a lower coal seam. Based on the study of mining conditions and overburdened space structures formed through mining, the deformation and failure law of the roadway in the strike and dip directions is obtained. Moreover, the stress evolution law of roadway deformation and failure is obtained by studying the influence of different mining stages and filling rates of the lower face on the mining of the overlying roadway. Results show that there are two types of potential roadway deformation and failure: (1) roadway section reduction failure and (2) roadway strike step subsidence failure. The fundamental cause of the deformation and failure of the overlying roadway is the influence of the large buried depth, strong mining stress, and unequal distance between the coal seam and roadway. The direct causes are the sudden increase in the stress of the roadway surrounding the rock and the subsidence of the key strata. In the mining process, when the mining range of the working face is more than 400 m, the roadway section reduction failure and strike ladder subsidence failure superimpose each other, inducing further roadway failure. Therefore, a scheme of partial filling and strengthening of the roadway along the working face is designed. Field measurements revealed that the above scheme can meet the stability requirements of the overlying roadway and the high efficiency and yield of the underlying working face. The results provide some references for the safe mining of coal in the 1000-m deep coal seam.

     

/

返回文章
返回
<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
259luxu-164