<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">

一種有利于提高DHCR比例的熱軋批量計劃編制方法

Hot-rolling batch planning method available to improve DHCR proportion

  • 摘要: 針對一體化生產過程中連鑄出坯順序與熱軋軋制順序的協調問題,提出了計劃順序協調因子,并在此基礎上建立了有利于提高直接熱裝(DHCR)比例的熱軋批量計劃優化模型.模型在滿足熱軋軋制工藝的基礎上充分考慮了鑄坯連鑄出坯計劃與熱軋軋制計劃的協調.采用改進遺傳算法——兩交換啟發交叉算法對模型進行了求解.最后,針對大批量少品種和小批量多品種兩組板坯對某鋼廠2250 mm和1580 mm軋線進行了仿真,仿真結果表明模型可以大大減少鑄坯因順序不協調而引起的在進入加熱爐前的等待時間,進而提高板坯DHCR比例.

     

    Abstract: Acoordination factor for the sequence of plans was proposed aimed to coordinating the casting production plan with the hot rolling production plan in an integrated production process.An optimization model of the hot-rolling batch plan available to improve the direct hot charging rolling(DHCR) proportion was established.On the basis of meeting the requirements of the hot rolling process,the model considers well the coordination of the casting production plan and the hot rolling production plan.A modified genetic algorithm,the two-exchange crossover heuristic algorithm,was used to solve the model.Finally,two slab groups which are large batch quantity with seldom types and small batch quantity with multiple types were simulated in the 2 250 mm hot rolling line and the 1 580 mm hot rolling line in a steel plant.The results show that the model could greatly reduce the waiting time of slabs caused by the casting slab sequence conflicts before entering the reheating furnace,and the DHCR proportion is increased correspondingly.

     

/

返回文章
返回
<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
259luxu-164