<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">

金川Ⅲ礦區硐室圍巖蠕變特性與支護時機

Creep features of surrounding rock and supporting time for the chamber in Jinchuan Mine No.3

  • 摘要: 針對金川Ⅲ礦區硐室圍巖蠕變控制問題,通過對破碎工程系統中大件道工程圍巖變形的監測發現有明顯的流變特性,即包括急劇變形、減速變形以及變形趨于穩定的三個階段.分析了圍巖應力環境、礦物成分和地下水對硐室圍巖變形的影響,提出了適合高地應力構造影響帶圍巖流變模型,并對流變參數作了分析.根據金川巖體流變過程是由彈性、塑性、黏彈性和黏塑性等多種變形共存的一個復雜過程,呈現出高度的非線性的特征,從理論上分析二次支護的最佳時機,即金川Ⅲ礦區深部巖體在開挖并進行一次支護后的第3周內可作為最佳的二次支護時機,允許變形量應控制在50~150 mm.

     

    Abstract: In order to solve the creep control problem of surrounding rock for the crushing chamber in Jinchuan Mine No.3,the deformation of channel surrounding rock in the crushing engineering system was monitored and it showed obviously rheological properties which include rapid deformation,slow deformation and deformation stabilization.By analyzing the effect of the stress environment of surrounding rock,mineral composition and ground water on the deformation of surrounding rock,a suitable high-stress and tectonic belt rheological model was proposed and its rheological parameters were analyzed.The rheological process of Jinchuan rock is a complex process in which elastic,plastic,visco-elastic and visco-plastic deformations coexists,with a highly nonlinear characteristic.The optimum time of the second support was analyzed in theory.The second support as the best opportunity ought to be carried out within the third week after deep rock excavation and the first support in the Jinchuan Mine No.3,and the allowable deformation should be controlled between 5 mm and 150 mm.

     

/

返回文章
返回
<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
259luxu-164