<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">

金川二礦區不良巖層巷道地壓活動規律及控制方法的研究

Study on the ground pressure and control method for openings in soft and broken rocks in Jin Chuon Mine No. 2

  • 摘要: 本文從理論和實踐的結合上闡述了不良巖層巷道維護問題。其要點是:①找出了1978年以前金川在不良巖層中采用多種支護型式都難以維護的根本原因是:把流變體圍巖穩定問題視為單純的傳統支護結構問題;②確定了不良巖層的基本屬性為易發展為松散體的流變體,從理論上闡明了不良巖層巷道必須分次支護的理由;③查明了不良巖層巷道地壓類型,以流變體變形地壓為主;④總結了地壓活動基本規律,分析了在圍巖縱深12米范圍內,最終出現的二個壓密區、一個松馳區、一個松動區,壓密區實際上是承載環,在圍巖穩定過程中起著關鍵作用,從理論上解釋了金川不良巖層巷道圍巖穩定過程;⑤采用了信息化設計——現場監控設計法;⑥提出了金川不良巖層巷道支護原理和設計方法,即根據巖層不同屬性,不同地壓來源,從分析地壓活動規律入手,運用信息化設計法,使支護特性和施工工藝過程不斷適應圍巖變形的活動狀態,以達到抑制圍巖變形、維護巷道穩定的目的。

     

    Abstract: This paper elucidates the theory and proclice of opening mainteance insoft and broken rocks. Its main peints are as follows.
    (1) The radical Cause of failure of viarous type of supporting structure in soft and broken rocks in Jin Chuon Mine before 1978 has been found to be that the stabilizing problem of rheological rocks around openings was simply regarded as a structure problem of conventional supporting.
    (2) The soft and broken rocks in Jin Chuon Mine is a kind of rheological materials which may readily become loose material. So it is necessary to use secondary supports for the openings in such rocks.
    (3) The ground prossure around the openings in soft and broken rocks in Jin chuon Mine is recognized as a deformation pressure of rheological amaterial.
    (4) The basic regularity of ground pressure in Jin Chuon Mine is determined there are two compressed and compacted regions,one slack region, and one broken region around the openings in 12 meters deep. The compressed and compacted regions are bearing circles and play a critical part in stabilizing the openings around.
    (5) An information design method, field supervision and control method is used in Jin Chuon Mine.
    (6) The supporting principles and design methods of openings in softs and broken rocks in Jin Choun Mine are put forward. It is important to us-information design method to make support property and construction tech-nic to fit deformation condition of rocks around the opening.lt is also important to restrain rock deformation and slabilite the apening through anal ysis of regularity of ground pressure in accordance with different rock properties and ground perssure type.

     

/

返回文章
返回
<th id="5nh9l"></th><strike id="5nh9l"></strike><th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th><strike id="5nh9l"></strike>
<progress id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"><noframes id="5nh9l">
<th id="5nh9l"></th> <strike id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span>
<progress id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"><noframes id="5nh9l"><span id="5nh9l"></span><strike id="5nh9l"><noframes id="5nh9l"><strike id="5nh9l"></strike>
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"><noframes id="5nh9l">
<span id="5nh9l"></span><span id="5nh9l"><video id="5nh9l"></video></span>
<th id="5nh9l"><noframes id="5nh9l"><th id="5nh9l"></th>
<progress id="5nh9l"><noframes id="5nh9l">
259luxu-164